Flortex EP is a two part 100% solids epoxy resin which provides an extremely hard wearing coating with a totally impervious gloss finish.
Flortex EP’s pure epoxy formulation withstands light forklift traffic, oil, chemicals and jet washing.
Coverage: 20sq.m at 200 microns thickness from a 5kg pot of Flortex EP
Flortex EP is supplied in 5kg units (Smooth) or 7kg (Slip Resistant).
Pot life:25 mins @ 20oC
Application temperature:10oC – 25oC
To accept pedestrian traffic:24 hours
To accept light wheeled traffic:4 days
Overcoat (if required) time:16-36 hours
Full strength cure time:7 days
Full compressive strength:68N/mm2
Full tensile strength:45N/mm2
Full flexural strength:85N/mm2
Elastic modulus:2.8KN/mm2
Number of parts supplied:2
Coverage:Approx. 20 sq.m. per 5kgs unit
Primer required:Yes
Please consult the technical data sheet for full technical product data on Flortex EP.
Preparation:Thorough substrate preparation is essential before applying Flortex EP.
Recommended methods are:
Powerfloated concrete – use a Vacuum Assisted Shotblaster to remove weak laitence and provide a surface key for the Flortex EP coating. If this is not possible, chemically etch with Polycote Etch IT then rinse thoroughly and allow to dry.
Loose paint or rust – remove, using a Vacuum Assisted Shotblaster, Floor Grinder or equivalent method.
Loose or friable concrete – use a Vacuum Assisted Shotblaster. If this is not possible, chemically clean with Polycoate Etch IT then rinse thoroughly and allow to dry.
Oil or grease – use Hot Compressed Air for large areas of contamination. Smaller, isolated deposits may be chemically cleaned with Polycote Degrease IT, then rinsed thoroughly and allowed to dry.
Prior to application of Flortex EP, a suitable primer should be applied. These include Polycote EP Primer, WD Primer or OT Primer, depending on the type and condition of the surface.
Please contact Polycote Technical Helpline, and prepare the surface in accordance with the appropriate primer data sheet.
Mixing:
Having fully prepared the substrate, stir the individual components before mixing together. Add Part ‘B’ to Part ‘A’ and thoroughly mix for at least 3 minutes. For best results use a heavy duty slow speed drill with a mixing paddle. Ensure thorough mixing as an unmixed product will result in a poor or non-cure situation.
Application:
Apply by brush, roller or squeegee, making sure that the surface is completely covered.
Particular attention should be given to doorways and other areas of high traffic. When finished, DO NOT scrape the remaining contents from the container as this will invariably include unmixed resin.