EP Primer is an ultra low viscosity 100% solid epoxy primer providing an extremely tough and totally impervious finish.
Use on: Concrete and cementitious substrates
Use where: Internal/External
Typical industries: Medical, animal, food-processing environments, warehouses, factories, workshops, laboratories and chemical bunds
Type of job: Used on its own to strengthen and dust proof a floor, or as a universal primer which is compatible with a wide range of epoxy topcoats and screeds
Approximate coverage: 5 kg unit – 15 – 20m2
Special features: Non-toxic, non-taint, solvent-free, strengthens substrate through maximum penetration into pores, provides dust protection
Pot life:30 mins @ 20oC
Application temperature:10oC – 25oC
Cure time: Initial cure- 6 – 8 hours @ 20oC
Light traffic – 18 – 24 hours
Heavy duty traffic – 48 hours
Number of parts supplied:2
Primer for:Polycote epoxy topcoats and screeds
Please consult the technical data sheet for full technical product data.
Preparation:
Thorough substrate preparation is essential.Recommended methods are:Powerfloated, loose or friable concrete – use a Vacuum Assisted Shotblaster to remove weak laitance and provide a surface key for the coating. If this is not possible, chemically etch with Polycote Etch IT then rinse thoroughly and allow to dry.Loose paint or rust – remove, using a Vacuum Assisted Shotblaster, Floor Grinder or equivalent method.Oil or grease – use Hot Compressed Air for large areas of contamination.Smaller, isolated deposits may be chemically cleaned with Polycote Degrease IT then rinsed thoroughly and allowed to dry. See relevant Data Sheet prior to application.Once prepared, the area must be kept clean and free of traffic.
Mixing:
Having fully prepared the substrate, stir the individual components before mixing together.Add part ‘B’ to part ‘A’ and thoroughly mix for at least 3 minutes.
For best results use a slow speed drill with a mixing paddle. Ensure thorough mixing as an unmixed product will result in a poor or non-cure situation.
Application:
Apply by brush, roller or squeegee, making sure that the surface is completely covered.
Particular attention should be given to doorways and other areas of high traffic.
When finished, DO NOT scrape the remaining contents from the container as this will invariably include unmixed raw resin.